Hybrid power for weak grids, peak shaving and temporary EV charging
When the grid cannot deliver enough power — or when a grid connection takes months — ENERGYPACK bridges the gap. Battery handles peaks, grid handles baseload, diesel stands by for backup.
Hybrid genset, sized to your peak
Weak-grid sites need battery storage that can deliver instantaneous peaks while the grid handles baseload. ENERGYPACK is engineered exactly for this duty.
KCG600E-POWER
For sites with multi-stall EV charging or heavy industrial peaks. 522 kWh of battery storage absorbs sharp load spikes.
View specs →
KCG300E-POWER
For smaller weak-grid sites — depot EV charging, small-shop industrial, temporary inner-city installations.
View specs →Grid-constrained challenges
When the grid is the bottleneck, building more grid is rarely the fastest answer. Hybrid energy storage closes the gap.
Insufficient grid capacity
The site has a grid connection, but it cannot support peak demand from EV chargers, construction equipment, or temporary installations.
Long grid upgrade timelines
Permanent grid upgrades take months. The project needs power now, not after the utility completes its work.
Temporary EV charging demand
Electric vehicle charging at events, depots, or construction sites creates sharp load spikes that the grid cannot absorb.
Diesel-only is wasteful
Running a diesel genset 24/7 for a site that has partial grid is expensive, noisy and hard to justify.
How ENERGYPACK supports weak-grid sites
The limited grid connection provides baseload and charges the battery during off-peak hours. When demand spikes — EV charging, equipment startup, peak production — the battery delivers the extra power instantly.
Diesel stands by as backup for extended high-demand periods or grid outages. The EMS coordinates all three sources automatically.
Peak shaving · smaller grid connection · temporary EV charging support · backup power · grid-constrained sites.
Have a grid-constrained project?
Share your grid capacity, peak demand and timeline. We will design the right solution.
Discuss project load